close

About

Oranga was first developed in the 1940s as a state housing area. Over the decades some of those homes have passed into private ownership, so the area now has a mix of private and state housing. Over the next five years, Oranga’s streets will be upgraded and over 1,200 new homes will be built. They’ll be a mix of standalone, apartments, duplexes and terraced homes in a range of plans to suit families of all shapes. All homes will be built to a 6 Homestar standard to ensure they are warm and cost-effective to maintain and around half of the homes for sale will be in the more affordable range, e.g. KiwiBuild. Click here to explore the map to find out more about what’s coming to Oranga.

 

Renovating the neighbourhood

Developing at such a large scale also gives us the opportunity to renovate the neighbourhood and Oranga will benefit from some upgrades that will make it an even better place to live. Power lines are being moved underground, new, wider footpaths will be built, new walkways will link cul de sacs with main roads, underground infrastructure is being renewed and future-proofed for Oranga’s residents, and the entrances to Fergusson Domain are being improved so that the community has better access to the park and playground. 

These upgrades will make Oranga more beautiful, more walkable, safer for people of all ages, and a more desirable place to put down roots and to bring up a family. 

 Check out our handy infrastructure video here.

 

Why we're investing in Oranga

Auckland needs more homes for more people, more quickly. Kāinga Ora is underway with a number of large scale development projects across the city as part of our Urban Development programme. The Oranga Development is one of these projects. We’ve chosen Oranga for development because of its central location, excellent proximity to employment hubs, good public transport connections and because the state housing in the area is aging and needs to be renewed. 

Oranga Development is one of the smaller, more boutique neighbourhood developments being undertaken by Kāinga Ora and  there is a great deal of interest from locals in the new homes coming to the area. Buying in Oranga is a smart move for those who want to be part of a neighbourhood that is benefiting from significant investment.

EXPLORE THE MAP

Click on each block on the map to see what’s going where in the Oranga neighbourhood.
location-group-28 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-28 location-group-25 location-group-28 location-group-25 location-group-28 location-group-25 location-group-28 location-group-25 location-group-28 location-group-25 location-group-28 location-group-25 location-group-28 location-group-25 location-group-28 location-group-25 location-group-26 location-group-25 location-group-26 location-group-25 location-group-26 location-group-26 location-group-25 location-group-26 location-group-26 location-group-25 location-group-27 location-group-27 location-group-27 location-group-25 location-group-27 location-group-25 location-group-27 location-group-25 location-group-27 location-group-26 location-group-25 location-group-27 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-25 location-group-27 location-group-27 location-group-27 location-group-27 location-group-28 location-group-28
Felix Street

Details to be confirmed.

Future Stage (site 6.5)

Future development will be planned in the stages over the next eight years.

Future Stage (site 10.5)

Future development will be planned in the stages over the next eight years.

Future Stage (site 29.5)

Future development will be planned in the stages over the next eight years.

Future Stage (site 37.5)

Future development will be planned in the stages over the next eight years.

Future Stage (site 40.5)

Future development will be planned in the stages over the next eight years.

Future Stage (site 8.5)

Future development will be planned in the stages over the next eight years.

Future Stage (site 22.5)

Future development will be planned in the stages over the next eight years.

Future Stage (site 49)

Future development will be planned in the stages over the next eight years.

Future Stage (site 23.5)

Future development will be planned in the stages over the next eight years.

Future Stage (site 1)

Future development will be planned in the stages over the next eight years.

Stage 3 (site 3)

Details to be confirmed.

Future Stage (site 2)

Future development will be planned in the stages over the eight years.

Stage 3 (site 4)

Details to be confirmed.

Future Stage (site 3)

Future development will be planned in the stages over the eight years.

Stage 3 (site 5)

Details to be confirmed.

Future Stage (site 4)

Future development will be planned in the stages over the next eight years.

Stage 3 (site 6)

Details to be confirmed.

Future Stage (site 5)

Future development will be planned in the stages over the next eight years.

Stage 3 (site 7)

Details to be confirmed.

Future Stage (site 6)

Future development will be planned in the stages over the next eight years.

Staging 3 (site 8)

Details to be confirmed.

Future Stage (site 7)

Future development will be planned in the stages over the next eight years.

Stage 3 (site 9)

Details to be confirmed.

Future Stage (site 8)

Future development will be planned in the stages over the next eight years.

Stage 3 (site 10)

Details to be confirmed.

Future Stage (site 9)

Future development will be planned in the stages over the next eight years.

34-40 Waitangi Road

Several older state homes that are past their best have been replaced with 4 new warm, dry homes:

• 2 x four-bedroom homes
• 2 x five-bedroom homes 

cloud_download
Future Stage (site 10)

Future development will be planned in the stages over the next eight years.

8-18 Edmonton Road

Several older state homes that are past their best are being replaced with 19 new warm, dry homes:

» 1 x six-bedroom home
» 12 x two-bedroom homes
» 6 x three-bedroom homes
» three-storey walk-up apartments

Construction of the new homes is underway and new homes are due to be completed Autumn 2022. 

zoom_in
cloud_download
Future Stage (site 11)

Future development will be planned in the stages over the next eight years.

54-66 State Avenue, 127-129 Rockfield Road

Several older state homes that are past their best are being replaced with 13 new warm, dry homes:

» 5 x three-bedroom homes
» 4 x four-bedroom homes
» 2 x five-bedroom homes
» 2 x six-bedroom homes

Construction of the new homes are underway with new homes expected to be completed Winter 2022.  

zoom_in
cloud_download
48C-52 State Avenue

Several older state homes that are past their best have been replaced with 4 new warm, dry homes:

• 3 x four-bedroom homes

• 1 x five-bedroom home

zoom_in
cloud_download
Future Stage (site 13)

Future development will be planned in the stages over the next eight years.

121A-121B Rockfield Road

Several older state homes that are past their best have been replaced with 2 new warm, dry homes:

• 2 four-bedroom homes

cloud_download
111 Rockfield Road

Several older state homes that are past their best have been replaced with 2 new warm, dry homes:

• 1 x four-bedroom home

• 1 x five-bedroom home

zoom_in
cloud_download
Future Stage (site 15)

Future development will be planned in the stages over the next eight years.

14-18 Roosevelt Ave

Several older state homes that are past their best are being replaced with 18 new warm, dry homes:

» 15 x two-bedroom homes
» 3 x three-bedroom homes

Construction due to start Summer 2021 with new homes expected to be completed Autumn 2022.

zoom_in
cloud_download
20 Edmonton Ave

Several older state homes that are past their best are being replaced with 2 new warm, dry homes:

» 2 x four-bedroom homes

Constrcution is now underway with new homes expected to be completed by Summer 2021/2022.

zoom_in
cloud_download
13 Nissan Place, 20 State Ave, 1-2 Treasury Place

Several older state homes that are past their best are being replaced with 9 new warm, dry homes:

» 4x four-bedroom homes 
» 5x five-bedroom homes

Construction is now underway with new homes expected to be completed by Winter 2022.

zoom_in
cloud_download
Future Stage (site 18)

Future development will be planned in the stages over the next eight years.

31 State Ave

Several older state homes that are past their best are being replaced with 2 new warm, dry homes:

» 2 x three-bedroom homes

Construction is underway with new homes expected to be completed by Autumn 2022.

zoom_in
cloud_download
Future Stage (site 19)

Future development will be planned in the stages over the next eight years.

41 Waitangi Road

Several older state homes that are past their best are being replaced with 2 new warm, dry homes:

» 1 x four-bedroom homes
» 1 x five-bedroom homes

Construction due to start Spring 2021 with new homes expected to be completed Winter 2022 

zoom_in
cloud_download
Future Stage (site 20)

Future development will be planned in the stages over the next eight years.

5-5A Wallath Road

Several older state homes that are past their best are being replaced with 9 new warm, dry homes:

» 4x four-bedroom homes
» Five five-bedroom homes

Construction is underway with new homes expected to be completed by Winter 2022.

zoom_in
cloud_download
60 Waitangi Road

An older state home that was past its best has been replaced with a new, warm, dry four-bedroom home. 

cloud_download
Future Stage (site 22)

Future development will be planned in the stages over the next eight years.

14-19 Gambia Place

Several older state homes that are past their best are being replaced with 21 new warm, dry homes:

» 12 x two-bedroom homes
» 9 x three-bedroom homes
» two-storey and three-storey walk-up apartments

The new homes are expected to be completed Spring 2022.

zoom_in
cloud_download
Future Stage (site 23)

Future development will be planned in the stages over the next eight years.

Future Stage (site 24)

Future development will be planned in the stages over the next eight years.

Future Stage (site 26)

Future development will be planned in the stages over the next eight years.

Future Stage (site 27)

Future development will be planned in the stages over the next eight years.

Future Stage (site 28)

Future development will be planned in the stages over the next eight years.

Future Stage (site 29)

Future development will be planned in the stages over the next eight years.

Future Stage (site 30)

Future development will be planned in the stages over the next eight years.

Future Stage (site 35)

Future development will be planned in the stages over the next eight years.

Future Stage (site 37)

Future development will be planned in the stages over the next eight years.

Future Stage (site 38)

Future development will be planned in the stages over the next eight years.

Future Stage (site 39)

Future development will be planned in the stages over the next eight years.

Future Stage (site 40)

Future development will be planned in the stages over the next eight years.

Future Stage (site 42)

Future development will be planned in the stages over the next eight years.

Future Stage (site 43)

Future development will be planned in the stages over the next eight years.

258-260 Mount Smart Road

Several older state homes that are past their best are being replaced with 15 new warm, dry homes:

» 15 x one-bedroom homes
» three-storey walk-up apartments

Construction is now underway with new homes expected to be completed Winter 2022.

zoom_in
cloud_download
9-13 Edmonton Avenue

Several older state homes that are past their best are being replaced with 32 new warm, dry homes:

» 7 x one-bedroom homes
» 25 x two-bedroom homes
» three-storey walk-up apartments

Constrcution is due to begin Autumn 2022 with new homes expected to be completed Autumn 2023.

 

zoom_in
cloud_download
139-149 Rockfield Road, 47-59 Edmonton Road

Several older state homes that are past their best are being replaced with 42 new warm, dry homes:

» 6 x one-bedroom homes
» 28 x four-bedroom homes
» 8 three-bedroom homes
» mix of duplex, standalone, three-storey walk-up apartments and terraces

Construction is due to begin Autumn 2022 with new homes expected to be complete Spring 2023.

zoom_in
cloud_download
28-30 State Avenue

Several older state homes that are past their best are being replaced with 4 new warm, dry homes:

» 4 x three-bedroom homes
» standalone homes

Construction is due to begin Spring 2021 with new homes expected to be completed Autumn 2022.

zoom_in
cloud_download
Stage 3 (site 1)

Details to be confirmed.

Stage 3 (site 2)

Details to be confirmed.

navigate_before
navigate_next

Latest news

View all
02 Aug 2022
New temporary one-way traffic system will improve safety and keep locals moving in Oranga
New temporary one-way traffic system will improve safety and keep locals moving in Oranga.
Read more
cloud_download
16 Jun 2022
Oranga Development Progress Update Winter 2022
Oranga Development Progress Update Winter 2022
Read more
Culture and kai brings Oranga together
The Oranga Community Centre recently celebrated Neighbours Day Aotearoa and Auckland Council’s World…
Read more